Hello! Welcome to visit Jiangyin City TongXin Vulcanizing Machine Official website

Company Hotline:+86-510-86336667

Mobile:18915223007/13706163052

Your Location:Home > > Frequently Asked Questions

Description of repair and temperature control of vulcanizer

Release Date:2019-12-30 16:47:54 Visits:1634
The repair methods include surfacing, thermal spraying, electric brush crossing, etc., but several methods have certain disadvantages: surfacing will cause the surface of the part to reach a high temperature, causing the part to deform or crack, affecting the dimensional accuracy and normal use, when serious It will also cause fractures; although the brush crossing has no thermal effect, the thickness of the crossing layer should not be too thick, the pollution is serious, and the application is also greatly restricted.
Temperature control instructions:
1. In the working process, when the mold temperature and the machine tool temperature are controlled by double closed loop, the mold temperature is always under high precision control, so as to ensure the perfect realization of the production process, and the closed loop will be lifted outside the working cycle.
2. During the temperature rise of the vulcanizing machine mold, the red light is on. When the operating temperature is reached, the alarm light turns green. If there is any change in the mold temperature during the production process of the vulcanizing machine and any point does not match the set temperature, the audible and visual alarm will be activated and the machine tool will automatically release the pressure.
3. The temperature control of the vulcanizing machine is that the intelligent controller controls the temperature of the upper, middle and lower three-layer heating plates during the vulcanization process, and displays the detection results of the heating plate temperature and the set temperature value on the display panel.

Copyright 2018 Jiangyin City TongXin Vulcanizing Machine

技术支持:网罗天下 苏ICP备12007278号